sk en

 

REFERENCES

SIGNIFICANT ORDERS:

Veolia Přerov, BFB Boiler

Client: Veolia Energie ČR, a.s.
Place: Přerov, Czech republic
Scope: Instrumentation installation works
Total manpower: > 15
No of LTI: 0
Duration: 2022

 

SAPPI MILL, MODERNIZATION OF BOILER 11

Client: Sappi Austria Produktions-GmbH
Place: Gratkorn, Austria
Scope: Instrumentation installation works
Total manpower: > 15
No of LTI: 0
Duration: 2021

 

Norske Skog Boiler K9

Client: Norske Skog Bruch GmbH
Place: Bruck an der Mur, Austria
Scope: Instrumentation installation works
Total manpower: > 20
No of LTI: 0
Duration: 2021

 

MONDI SCP, NEW PAPER MACHINE PM19

Client: MONDI SCP, a.s.
Place: Ružomberok, Slovakia
Scope: Instrumentation installation, Failsafe and network cabinets production, Fire alarm systems
Total manpower: > 80
No of LTI: 0
Duration: 2020-2021

 

ZELLSTOFF PÖLS AG - Paper Machine 3

Client: Zellstoff Pöls/Andritz
Contractor: Siemens AG Oester.
Place: Pöls, Rakúsko
Scope: Installation of new cable trays, cable termination, grounding
Total manpower: > 25
No of LTI: 0
Duration: 2018-2019

 

AGRANA STÄRKE GMBH - New Wheat Starch Production Plant

Client: Agrana Stärke GmbH
Contractor: Siemens AG Oester
Place: Pischelsdorf, Rakúsko
Scope: Electrical and instrumentation installation
Total manpower: > 25
No of LTI: 0
Duration: 2019

 

ECOFLEX - New recovery boiler R12 + Woodyard

Client: Mondi Steti a.s.
Contractor: Mondi Steti a.s., Andritz Oy, Valmet Oy
Place: Steti, Czech Repuplic
Scope: Main subcontractor for electrical Works (Woodyard) and instrumentation Works (boiler)
Total manpower: > 45
No of LTI: 0
Duration: 2017-2018

 

LDPE4 - Low Density Polyethylene unit

Client: Slovnaft a.s.
Contractor: Tecnimont SpA Italy
Place: Bratislava, Slovakia
Scope: Main Subcontractor for E&I Works
Total manpower: > 120/280 000 mh
No of LTI: 0
Duration: 2014-2016

 

FLUIDIZED BED BOILER K14

Client: Arcelor-Mittal Ostrava
Contractor: Valmet Technologies Oy
Place: Ostrava, Czech Republic
Scope: Main Subcontractor for E&I Works
Total manpower: > 25
No of LTI: 0
Duration: 2014-2015

 

RB3 PROJECT - Recovery Boiler 1750 t

Client: Mondi SCP a.s.
Contractor: Andritz OY, Andritz AG
Place: Ruzomberok, Slovakia
Scope: Main Subcontractor for E&I Works
Total manpower: > 45
No of LTI: 0
Duration: 2015

 

DATA NETWORKS - VOLKSWAGEN BODY SHOP

Client: Volkswagen Slovensko a. s.
Contractor: ATOS IT
Place: Bratislava, Slovakia
Scope: Data networks installation, Fibre optics installation for the production unit
Total manpower: > 20
No of LTI: 0
Duration: 2014-2015

 

ECOFLEX - Woodyard MONDI Steti

Client: MONDI Steti, a.s.
Contractor: MONDI Steti, a.s. Andritz
Place: Steti, Czech Republic
Scope: Electrical erection of Roundpile and Chips unloading, New chipper electrical installations
Total manpower: > 30
No of LTI: 0
Duration: 2017

 

GDK Mellach - 2x470MW

Client: Austrian Thermal Power
Contractor: JSP, s.r.o.
Place: Mellach, Austria
Scope: Instrumentation Works
Total manpower: > 40
No of LTI: 0
Duration: 2010-2012

 

FURNACES REVAMP - Ethylene Unit II

Client: Slovnaft, a.s.
Contractor: IDO HUTNÝ PROJEKT
Place: Bratislava, Slovakia
Scope: Main Subcontractor for E&I Works
Total manpower: > 50
No of LTI: 0
Duration: 2007-2010

 

POLYPROPYLENE PLANT 3

Client: Slovnaft, a.s.
Contractor: LINDE/ABB Waeschle Coperion
Place: Bratislava, Slovakia
Scope: INSTR Works, Central control room electrical installation and raised floor installation
Total manpower: > 110
No of LTI: 0
Duration: 2005-2006

 

HYDROGEN DESULPHURIZATION UNIT HRP7

Client: Slovnaft, a.s.
Contractor: SLOVNAFT/ABB LUMMUS
Place: Bratislava, Slovakia
Scope: INSTR Works
Total manpower: > 60
No of LTI: 0
Duration: 2004

 

PAPER MACHINES

  • 2003 - MONDI SCP, a.s. Ružomberok / VOITH AG, Metso Automation, BVG
    • IMPULS PROJECT, Rebuild of paper machine PM18, 9.000 I/O, Honeywell – QCS
  • 1999 - MONDI SCP, a.s. Ruzomberok / VOITH AG, Metso Automation, BVG
    • Rebuild of paper machine PM17, 7.0000 I/O
  • TENTO a.s., Žilina
    • Modernization paper machines PM1, PM2
  • 1993-1996 - Poland
    • 3 paper machines for International Paper - Kwidzyn Sp. z o.o, pre VOITH Austria
 

DATA CENTERS

  • Tatra banka a.s.
    • 2 datacenters, Tatracentrum, Call centrum and branches across the Country
  • Slovak Telekom a.s.
    • Data center TKB Kosice , Data center Bzenov, Call centrum Bytca, Call Centrum Kosice, T-Centrum cca 50 sales points across the Country
  • Minstry of education SR, CVTI
    • Data center Bratislava, Zilina
  • Mondi SCP, a.s Ružomberok
    • 11 data networks, data centers, CCTV and access systems
 

AUTOMOTIVE

  • Volkswagen Slovakia a. s. / Siemens AG Oester - Production hall H3a for SUV Porsche Cayenne
    • Electrical installation of conveyor system
  • Volkswagen Slovakia a. s. / Siemens AG Oester - Production hall 4a-4c
    • Electrical installation of conveyor system
  • KIA MOTORS SLOVAKIA / STAMART Martin - Training and education center Kia Motors Slovakia
    • Installation of data networks, access systems and CCTV
  • Volkswagen Slovakia a. s. / VMA Belgium
    • Electrical installation of robotics for Hala H4a AUDI BRATISLAVA
 

OTHER FOREIGN REFERENCES

  • 1993 - 1996 - Poland
    • 3 paper machines for International Paper - Kwidzyn Sp. z o.o, pre VOITH Austria
  • Austria
    • Combined-cycle power plant, electrical and instrumentation installation for Siemens at VERBUND – Austrian Thermal Power GmbH, Fernheizkraftwerk Mellach
  • Italy
    • 3 Boilers v AEM Torino Distribuzione S.p.A

REFERENCES

SIGNIFICANT ORDERS:

Veolia Přerov, BFB Boiler

Client: Veolia Energie ČR, a.s.
Place: Přerov, Czech republic
Scope: Instrumentation installation works
Total manpower: > 15
No of LTI: 0
Duration: 2022

 

SAPPI MILL, MODERNIZATION OF BOILER 11

Client: Sappi Austria Produktions-GmbH
Place: Gratkorn, Austria
Scope: Instrumentation installation works
Total manpower: > 15
No of LTI: 0
Duration: 2021

 

Norske Skog Boiler K9

Client: Norske Skog Bruch GmbH
Place: Bruck an der Mur, Austria
Scope: Instrumentation installation works
Total manpower: > 20
No of LTI: 0
Duration: 2021

 

MONDI SCP, NEW PAPER MACHINE PM19

Client: MONDI SCP, a.s.
Place: Ružomberok, Slovakia
Scope: Instrumentation installation, Failsafe and network cabinets production, Fire alarm systems
Total manpower: > 80
No of LTI: 0
Duration: 2020-2021

 

ZELLSTOFF PÖLS AG - Paper Machine 3

Client: Zellstoff Pöls/Andritz
Contractor: Siemens AG Oester.
Place: Pöls, Rakúsko
Scope: Installation of new cable trays, cable termination, grounding
Total manpower: > 25
No of LTI: 0
Duration: 2018-2019

 

AGRANA STÄRKE GMBH - New Wheat Starch Production Plant

Client: Agrana Stärke GmbH
Contractor: Siemens AG Oester
Place: Pischelsdorf, Rakúsko
Scope: Electrical and instrumentation installation
Total manpower: > 25
No of LTI: 0
Duration: 2019

 

ECOFLEX - New recovery boiler R12 + Woodyard

Client: Mondi Steti a.s.
Contractor: Mondi Steti a.s., Andritz Oy, Valmet Oy
Place: Steti, Czech Repuplic
Scope: Main subcontractor for electrical Works (Woodyard) and instrumentation Works (boiler)
Total manpower: > 45
No of LTI: 0
Duration: 2017-2018

 

LDPE4 - Low Density Polyethylene unit

Client: Slovnaft a.s.
Contractor: Tecnimont SpA Italy
Place: Bratislava, Slovakia
Scope: Main Subcontractor for E&I Works
Total manpower: > 120/280 000 mh
No of LTI: 0
Duration: 2014-2016

 

FLUIDIZED BED BOILER K14

Client: Arcelor-Mittal Ostrava
Contractor: Valmet Technologies Oy
Place: Ostrava, Czech Republic
Scope: Main Subcontractor for E&I Works
Total manpower: > 25
No of LTI: 0
Duration: 2014-2015

 

RB3 PROJECT - Recovery Boiler 1750 t

Client: Mondi SCP a.s.
Contractor: Andritz OY, Andritz AG
Place: Ruzomberok, Slovakia
Scope: Main Subcontractor for E&I Works
Total manpower: > 45
No of LTI: 0
Duration: 2015

 

DATA NETWORKS - VOLKSWAGEN BODY SHOP

Client: Volkswagen Slovensko a. s.
Contractor: ATOS IT
Place: Bratislava, Slovakia
Scope: Data networks installation, Fibre optics installation for the production unit
Total manpower: > 20
No of LTI: 0
Duration: 2014-2015

 

ECOFLEX - Woodyard MONDI Steti

Client: MONDI Steti, a.s.
Contractor: MONDI Steti, a.s. Andritz
Place: Steti, Czech Republic
Scope: Electrical erection of Roundpile and Chips unloading, New chipper electrical installations
Total manpower: > 30
No of LTI: 0
Duration: 2017

 

GDK Mellach - 2x470MW

Client: Austrian Thermal Power
Contractor: JSP, s.r.o.
Place: Mellach, Austria
Scope: Instrumentation Works
Total manpower: > 40
No of LTI: 0
Duration: 2010-2012

 

FURNACES REVAMP - Ethylene Unit II

Client: Slovnaft, a.s.
Contractor: IDO HUTNÝ PROJEKT
Place: Bratislava, Slovakia
Scope: Main Subcontractor for E&I Works
Total manpower: > 50
No of LTI: 0
Duration: 2007-2010

 

POLYPROPYLENE PLANT 3

Client: Slovnaft, a.s.
Contractor: LINDE/ABB Waeschle Coperion
Place: Bratislava, Slovakia
Scope: INSTR Works, Central control room electrical installation and raised floor installation
Total manpower: > 110
No of LTI: 0
Duration: 2005-2006

 

HYDROGEN DESULPHURIZATION UNIT HRP7

Client: Slovnaft, a.s.
Contractor: SLOVNAFT/ABB LUMMUS
Place: Bratislava, Slovakia
Scope: INSTR Works
Total manpower: > 60
No of LTI: 0
Duration: 2004

 

PAPER MACHINES

  • 2003 - MONDI SCP, a.s. Ružomberok / VOITH AG, Metso Automation, BVG
    • IMPULS PROJECT, Rebuild of paper machine PM18, 9.000 I/O, Honeywell – QCS
  • 1999 - MONDI SCP, a.s. Ruzomberok / VOITH AG, Metso Automation, BVG
    • Rebuild of paper machine PM17, 7.0000 I/O
  • TENTO a.s., Žilina
    • Modernization paper machines PM1, PM2
  • 1993-1996 - Poland
    • 3 paper machines for International Paper - Kwidzyn Sp. z o.o, pre VOITH Austria
 

DATA CENTERS

  • Tatra banka a.s.
    • 2 datacenters, Tatracentrum, Call centrum and branches across the Country
  • Slovak Telekom a.s.
    • Data center TKB Kosice , Data center Bzenov, Call centrum Bytca, Call Centrum Kosice, T-Centrum cca 50 sales points across the Country
  • Minstry of education SR, CVTI
    • Data center Bratislava, Zilina
  • Mondi SCP, a.s Ružomberok
    • 11 data networks, data centers, CCTV and access systems
 

AUTOMOTIVE

  • Volkswagen Slovakia a. s. / Siemens AG Oester - Production hall H3a for SUV Porsche Cayenne
    • Electrical installation of conveyor system
  • Volkswagen Slovakia a. s. / Siemens AG Oester - Production hall 4a-4c
    • Electrical installation of conveyor system
  • KIA MOTORS SLOVAKIA / STAMART Martin - Training and education center Kia Motors Slovakia
    • Installation of data networks, access systems and CCTV
  • Volkswagen Slovakia a. s. / VMA Belgium
    • Electrical installation of robotics for Hala H4a AUDI BRATISLAVA
 

OTHER FOREIGN REFERENCES

  • 1993 - 1996 - Poland
    • 3 paper machines for International Paper - Kwidzyn Sp. z o.o, pre VOITH Austria
  • Austria
    • Combined-cycle power plant, electrical and instrumentation installation for Siemens at VERBUND – Austrian Thermal Power GmbH, Fernheizkraftwerk Mellach
  • Italy
    • 3 Boilers v AEM Torino Distribuzione S.p.A
About us References What we do Certificates Gallery Contact